Windsor SABER S34 Instruções de Operação Página 14

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 17
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 13
14
SERVICE SCHEDULE
SABER/STRIDE II 28/34 98570 5/1/98
Maintenance Item Daily Weekly Monthly Annually
Check Battery water level *
Check Vac Hose Connections *
Clean the Squeegee Blades *
Inspect Brushes or Pads for debris ie: wire, string, wear *
Inspect Vac fan shut off float screen *
Drain & Rinse Tanks *
Raise Squeegee Assembly *
Raise Scrub Deck Assembly *
Charge the Batteries *
Remove the Pad Drivers/Brushes *
Check the Brushes/Padsfor Damage and or wear *
Clean Squeegee blades *
Clean recovery tank vac shutoff & screen *
Check Battery Cells w/Hydrometer *
Check Solution Strainer *
Check Pivot Points, Caster, and Squeegee for proper lubrication *
Inspect tank and hoses *
Clean tops of Batteries and Tray *
Check Battery Cable Clamps *
Use a Vacuum to remove lint from the motor windings *
Grease Squeegee pivot and Casters *
Inspect all Motors for Carbon Motor Brush Wear. *
Before
Starting
the Work
Period
End of Work
Period
Before
Storing
Downloaded from www.Manualslib.com manuals search engine
Vista de página 13
1 2 ... 9 10 11 12 13 14 15 16 17

Comentários a estes Manuais

Sem comentários